All Categories

Shenzhen Topwell Technology Co.,Ltd

Welcome to Shenzhen Topwell Technology Co.,Ltd, a leading product Manufacturing Company in China with over 27 years of experience. We provide services such as: Industrial Design, Mechanical Design, Mould Design and Manufacturing, Second processing and Product assembly. We also offer one-stop services for plastic parts and products.

ISO
Aluminum Injection Mold

Custom Diecasting Die Casting Suppliers Aluminium Fabrication Service

Inquiry
  • Overview
  • Description
  • Product Picture
  • Inquiry
  • Related Products
Place of OriginGuangdong,China
Brand NameTopwell
Model NumberTopwell0707
Product nameDie Casting Parts
MaterialStainless Steel Aluminum
Surface treatmentPolishing
ProcessCasting +Machining(if Need)+surface Treatment
ServiceOEM ODM Customised
CertificationISO9001:2015
StandardASTM
ColorCustomized Color
ToleranceCustomer's Drawing Request
Quality ControlProfessional Inspection

Description

Plastic materialCarbon steel, Low alloy steel, Stainless steel, Heat resistance steel, Tool steel, etc.
ColorWhite, black, red, blue..et. according to customer's requirement
Producing ProcessInvestment casting
Sureface treatmentKTL(E-coating), Zinc plating, Mirror Polishing, Sand Blasting, Acid pickling,  black oxide, Painting, Hot galvanizing,Powder coating, Nickel plating
ProcessLost Wax Casting + CNC Machining (Optional)
Casting Tolerance± 0.1 mm
Thickness Range0.7mm
Material StandardASTM, AISI, DIN, BS, JIS, NF, AS, GB, AAR and Others
Surface RoughnessRa 0.8 ~ 3.2 μm
Casting SizeMax linear size: 1200mm, Max diameter size: 600mm
Weigh Range0.1KG~100KG
Machining PrecisionPositioning accuracy 0.008mm, Rep. position. accuracy 0.006mm
Machining Surface roughnessRa0.8~6.3um
Package1.Inner plastic bags with foam, outer for cartoon or wooden cases with good protect; 2.according to customer's requirement
ApplicationsTrain & railway, automobile& truck, construction machinery, forklift, agricultural machinery, shipbuilding, petroleum machinery, construction, valve and pumps, electric machine, hardware, power equipment and so on.
deliver wayDHL, Fedex, TNT, UPS, DDU, by sea, by air..ect.
Lead timenormaly 3-10days, just according to order quantity.
Quality contorl systemISO9001: 2015, TS16949, RoHS
Payment term50% down payment, balance payment before shippment.

Product Picture

铸造零件-16铸造零件-17铸造零件-22铸造零件-23

GET IN TOUCH

onlineONLINE